公司新聞
聯(lián)系我們
濟南福華建材廠
聯(lián)系人:吳老師
電話:
手機:13864111871
0531-81901300
地址:山東省濟南市高新開發(fā)區(qū)巨野河辦事處山圈村西
抹面砂漿施工期間會用到怎樣的技術(shù)
來源:http://m.man5g.cn 日期:2023-05-25 發(fā)布人:
現(xiàn)在建筑中使用的綠色建材越來越多,抹面砂漿的應(yīng)用也在不斷發(fā)展,施工技術(shù)也在不斷更新。那么抹面砂漿的具體施工工藝有哪些呢?下面和大家說說濟南抹面砂漿施工技術(shù)。
Nowadays, there are more and more green building materials used in buildings, and the application of plastering mortar is also constantly developing, and construction technology is also constantly updating. So what are the specific construction techniques for plastering mortar? Next, let's talk about the construction technology of Jinan plastering mortar.
一、基層處理
1、 Grassroots treatment
基層施工前,需要將基層表面清理干凈,保持干凈整潔,無污漬。
Before the construction of the base layer, it is necessary to clean the surface of the base layer, keep it clean, tidy, and free from stains.
1.基面上有凹凸區(qū)域、裂紋或孔洞等,應(yīng)該先修平整。
1. If there are concave and convex areas, cracks or holes on the base surface, they should be leveled first.
2.門窗框和墻之間的縫隙需要用填縫材料填實。
2. The gap between the door and window frames and the wall needs to be filled with caulking material.
3.提前24小時濕潤基面,石膏抹灰施工前不能有明水。
3. Wet the base surface 24 hours in advance, and there should be no open water before the gypsum plastering construction.
4.需要做墻面、門窗、墻角等部位的抹灰護角。
4. It is necessary to plaster and protect the corners of walls, doors and windows, and walls.
二、抹面砂漿的工藝
2、 The process of plastering mortar
1.天花板。彈線、抹灰餅、標(biāo)出水平線、抹平窗框縫隙、墻面沖筋、抹底層砂漿、抹面砂漿。
1. Ceiling. Snapping lines, plastering cakes, marking horizontal lines, smoothing window frame gaps, wall reinforcement, plastering bottom mortar, and plastering surface mortar.
2.墻壁。找標(biāo)記線貼灰餅,抹踢腳線,保護門窗角,抹門窗框縫隙,墻面沖筋,抹底灰,抹面層灰。
2. Walls. Find the marking line, paste the mortar cake, plaster the baseboard, protect the door and window corners, plaster the door and window frame gaps, flush the wall, plaster the bottom mortar, and plaster the surface layer.


3.石膏抹面砂漿操作流程
3. Gypsum plastering mortar operation process
4.確定抹灰施工順序,自上而下,從門的一側(cè)開始,整面墻連續(xù)施工。
4. Determine the plastering construction sequence from top to bottom, starting from one side of the door, and continuously construct the entire wall.
5.普通混凝土天花板需要用抹灰膏抹一次。
5. Ordinary concrete ceilings need to be plastered once with plaster.
三、墻基要保持平整。
3、 The wall base should be kept flat.
設(shè)置標(biāo)記和加固。立桿的間距應(yīng)為1.2-1.5米,橫桿的寬度應(yīng)為0.03-0.05米
Set up markings and reinforcement. The spacing between upright poles should be 1.2-1.5 meters, and the width of horizontal poles should be 0.03-0.05 meters
1.抹灰施工厚度小于5厘米可采用抹灰抹灰施工,可在底層打底后,再做面層抹灰施工。
1. If the thickness of the plastering construction is less than 5 centimeters, the plastering construction can be used. The surface layer can be plastered after the bottom layer is bottomed.
2.根據(jù)設(shè)計厚度,施工后進行基層抹灰,然后用H型尺和刮刀緊貼鋼筋,不斷刮平層灰。
2. According to the design thickness, the base layer should be plastered after construction, and then an H-shaped ruler and scraper should be used to tightly adhere to the steel bars, continuously scraping the layer of mortar.
3.用抹子壓光,然后用直尺檢查墻面的平整度。
3. Use a trowel to polish and then use a ruler to check the flatness of the wall.
4.抹灰需要注意細(xì)節(jié)和清理相關(guān)區(qū)域。
4. Plastering requires attention to details and cleaning of relevant areas.
5.抹灰要清理地板灰,壓光后需要注意保持通風(fēng),用水沖洗完。抹面砂漿施工結(jié)束后,抹灰工具需要清理干凈。
5. When plastering, the floor plaster should be cleaned, and after polishing, attention should be paid to maintaining ventilation and rinsing with water. After the completion of plastering mortar construction, the plastering tools need to be cleaned.
抹面砂漿施工期間會用到的技術(shù)內(nèi)容就講解到這里了,希望能夠給您好的幫助,更多事項就來我們網(wǎng)站http://m.man5g.cn進行咨詢了解!
That's all for the technical content that will be used during the plastering mortar construction period. We hope it can be helpful to you. For more information, please come to our website http://m.man5g.cn Conduct consultation to understand!

魯公網(wǎng)安備